2013 NEWS


Home     

CHECK OUT NILES CANYON SIGNAL DEPARTMENT WEB SITE - CLICK ON WEB LINKS TO THE LEFT

CHECK OUT MOW UPDATES - CLICK ON THE BUTTON TO THE LEFT

APRIL 26, 2013

Sutterville Crossing Signal WorkSutterville Crossing Signal WorkSutterville Crossing Signal WorkA Signal Crew consisting of Signal Engineering and Training Supervisor and EIC, Paul1, Signal Maintainer, Jim1 and Senior Signal Worker, Bill1, went to work today with the idea in mind that they might finally get the Island Circuit associated with the old Safetran Grade Crossing Predictor working - based on research done and a hypothesis conjured up by Jim1 - at Sutterville Road today.  It worked!!  It appears that both the island and approach circuits are working (The island circuit has not worked independantly of the approach circuits since the crossing was placed back in service in 2001 or perhaps 2002.) and the GCP is picking up a Signal Maintainers Shunt correctly and consistently.  Way to Go Jim1 and Way to Go Crew!!!!  Thanks for a job Well Done!

 

APRIL 23, 2013

ANNUAL PART 214 EIC EXAMINATION TRAINING MATERIAL RELEASED

The Annual Signal Department Roadway Worker Safety Training for Employees In Charge is scheduled for Saturday, May 18th this year.  All Signal Maintainers must take the training and pass an associated examination to continue to be certified.  Any SSRR Crew Member may attend the training and take the exam.  Signal Engineering and Training Supervisor, Paul1, has released the Training Material for the examination today and it has been posted on the Signal Server.  It is in the SSRR Signal Training section in a folder titled Part 214 EIC Examination Training Material.  Be sure to study early and be ready!!!

APRIL 17, 2013

Landmark Measuring DayLandmark Measuring DayLandmark Measuring Day Landmark Measuring DayLandmark Measuring DayLandmark Measuring DayLandmark Measuring Day Landmark Measuring Day Landmark Measuring Day

A survey of commonly used (by the Signal Department) Landmarks along the SSRR Main Line was made on April 17th to update associated Mile Post Numbers. The SSRR Main Line Schematic Diagram was updated using the results of the survey and the revised diagram has been posted on the Signal Server.  It is located in the folder titled "SSRR Signal Training" in a sub-folder titled "Part 214 EIC Examination Training Material"  The title of the diagram is:  "Handout of Milepost MP 00.30 to MP 03.90 - 002 REV A". The diagram is used by Employee In Charge Signal Maintainers when setting up On-Track Safety procedures to protect Signal Roadway Workers working on the right of way.

 

APRIL 6, 2013

Sutterville Road FlowersSutterville Road FlowersSutterville Road FlowersSutterville Road FlowersSutterville Road FlowersSutterville Road Flowers

If you have not yet been past the Sutterville Road and South Land Park Drive crossings for a few weeks, you should.  Signal Associate Carol has done her magic and the flowers there are looking Good!!!!!


MARCH 28, 2013
SIGNAL SHOP REPORT #2013-11

MARCH 7, 2013
SIGNAL SHOP REPORT #2013-08

FEBRUARY 28, 2013
SIGNAL SHOP REPORT #2013-07

FEBRUARY 21, 2013
SIGNAL SHOP REPORT #2013-06

FEBRUARY 14, 2013
SIGNAL SHOP REPORT #2013-05

FEBRUARY 4, 2013
SIGNAL SHOP REPORT #2013-04

 

2012 NEWS ARCHIVE

2011 NEWS ARCHIVE

2010 NEWS ARCHIVE

2009 NEWS ARCHIVE

2008 NEWS ARCHIVE